Office for Nuclear Regulation

Monthly archives: June 2022

Heysham 1 – Inspection ID: 22-005

June 30, 2022

Site: Heysham 1 IR number: 22-005 Date: April 2022 LC numbers: 28 Executive summary Purpose of Intervention The purpose of this inspection was to undertake an electrical engineering licence condition (LC) 28 compliance inspection at EDF Energy Nuclear Generation Limited (NGL) Heysham 1 power station, in line with the inspection programme contained in the Heysham […]

Read more


Sellafield – Inspection ID: 22-020

June 30, 2022

Site: Sellafield IR number: 22-020 Date: May 2022 LC numbers: 32 Executive summary Purpose of Intervention This inspection was carried out at the Sellafield Limited Special Nuclear Materials (SNM) value stream facilities in the North and South of the Sellafield Site. It was a planned inspection identified as ISS-50116 on the 2022/23 inspection schedule database. […]

Read more


Hinkley Point C – Inspection ID: 22-019

June 30, 2022

Site: Hinkley Point C IR number: 22-019 Date: April 2022 LC numbers: 19 Executive summary Purpose of Intervention In accordance with the Office for Nuclear Regulation’s (ONR’s) Hinkley Point C (HPC) Construction Inspection Plan, ONR performs a series of planned compliance inspections of applicable licence conditions. This is to ensure that the licensee, NNB Generation […]

Read more


Dounreay – Inspection ID: 22-011

June 30, 2022

Site: Dounreay IR number: 22-011 Date: April 2022 LC numbers: 8, 10, 12, 23, 24, 28 Executive summary Purpose of Intervention This intervention, conducted at Dounreay Site Restoration Limited (DSRL), was undertaken in accordance with the 2021/22 Integrated Intervention Strategy (IIS) for Dounreay (note – this intervention was originally scheduled to be undertaken in December […]

Read more


Heysham 2 – Inspection ID: 22-014

June 30, 2022

Site: Heysham 2 IR number: 22-014 Date: April 2022 LC numbers: N/A Executive summary Purpose of Intervention The purpose of this intervention was to ensure that Heysham 2 power station is demonstrating compliance with the life safety requirements of the Regulatory Reform (Fire Safety) Order 2005. This was a planned inspection at Heysham 2 power […]

Read more


Decommissioning dutyholder moves out of enhanced regulatory attention after security improvements

June 30, 2022

Security improvements made during last 12 months

Read more


Strengthening global nuclear safety by working together

June 29, 2022

Working together to strengthen global nuclear safety

Read more


Dungeness B – Inspection ID: 22-019

June 28, 2022

Site: Dungeness B IR number: 22-019 Date: April 2022 LC numbers: 7 Executive summary Purpose of Intervention In accordance with the Office for Nuclear Regulation’s (ONR’s) Dungeness B (DNB) intervention plan, ONR performs a series of planned compliance inspections of identified licence conditions (LCs) and other applicable legislation, to ensure that DNB is meeting its […]

Read more


Innovation workshop on Artificial Intelligence and data science in nuclear

June 28, 2022

Artificial Intelligence and data science discussed

Read more


Dungeness B – Inspection ID: 22-010

June 28, 2022

Site: Dungeness B IR number: 22-010 Date: April 2022 LC numbers: 28 Executive summary Purpose of Intervention The purpose of this inspection was to undertake an electrical engineering licence condition (LC) 28 compliance inspection at EDF Energy Nuclear Generation Limited (NGL) Dungeness B power station, in line with the inspection programme contained in the Dungeness […]