October 17, 2023 - Executive summary Date(s) of inspection: August 2023 Aim of inspection This was a targeted inspection of the adequacy of the fire safety and emergency arrangements at Hinkley Point C (HPC) with the aim of assessing compliance with the Regulatory Reform (Fire Safety) Order 2005 (RRO) during construction activities. The aim of the inspection was to […]